Industrial – HVAC

HVAC Diagnosis – MCC Room Cooling

Purpose of the Equipment

  • Provide cooling and dehumidification for a high voltage switch room, capacitor room, and battery room

Problems:

  • High room temperatures during summer months
  • Soot and dust prevalent
  • Poor air circulation
  • Condensation of duct work during the winter months

Services Provided:

  • Review of the system components
  • Cooling system audit report containing the following information:
    • Analysis basis
    • Observations
    • Proper air flow rates for proper cooling and pressurization
    • Cooling Load Reduction opportunities
    • Heat Gain Calculation Summary
    • Options to reduce soot, dust, and condensation
    • Options for improving air circulation
    • Recommendations for equipment upgrades to increase energy efficiency and reduce operating costs
Click on the images below to see larger version