Industrial – HVAC
HVAC Diagnosis – MCC Room Cooling
Purpose of the Equipment
- Provide cooling and dehumidification for a high voltage switch room, capacitor room, and battery room
Problems:
- High room temperatures during summer months
- Soot and dust prevalent
- Poor air circulation
- Condensation of duct work during the winter months
Services Provided:
- Review of the system components
- Cooling system audit report containing the following information:
- Analysis basis
- Observations
- Proper air flow rates for proper cooling and pressurization
- Cooling Load Reduction opportunities
- Heat Gain Calculation Summary
- Options to reduce soot, dust, and condensation
- Options for improving air circulation
- Recommendations for equipment upgrades to increase energy efficiency and reduce operating costs